Under Development

Sl No. Name of Project State District Capacity in MW Installed Capacity in MW
1 Mosi SHP Arunachal Pradesh Upper Subansiri 3×2.2 6.6
2 Taksang Chu SHP Arunachal Pradesh Tawang 3×1.4 4.2
3 Taksang Gompa SHP Arunachal Pradesh Tawang 2×1.4 2.8
4 Ano SHP Arunachal Pradesh Dibang Valley 2×7.5 15.0
5 Selin SHP Arunachal Pradesh Upper Subansiri 2×9.5 19.0

New Proposal of Mini Hydel Project

Sl No. Name of Project State District Capacity in KW Installed Capacity in KW
1 Gra Nallah Arunachal Pradesh Dibang Valley 400 400
2 Ghai Nallah Arunachal Pradesh Papum Pare 500 500
3 Ruth Nallah Arunachal Pradesh Lower Subansiri 600 600
4 Pein Nallah Arunachal Pradesh Lower Subansiri 800 800
5 Pakoti River Arunachal Pradesh East Kameng 400 400
6 KahiPani Arunachal Pradesh East Kameng 400 400
7 Ngo Koro Arunachal Pradesh Upper Subansiri 450 450
8 Pero Nallah Arunachal Pradesh East Kameng 700 700
9 Rinon River Arunachal Pradesh Changlang 600 600
10 Tissing River Arunachal Pradesh Longding 900 900
11 Tallo Arunachal Pradesh Lower Subansiri 650 650
12 Seh Nallah Arunachal Pradesh Lower Subansiri 500 500